J-2X -- Back in the Saddle Again
A
J-2X power pack assembly burns brightly during a hot fire test Nov. 27
at NASA's Stennis Space Center in Mississippi. Engineers pulled the
assembly from the test stand in September to install additional
instrumentation in the fuel turbopump. The test, which ran for 278
seconds, verified the newly installed strain gauges designed to measure
the turbine structural strain when the turbopump is spinning at high
speeds that vary between 25,000 and 30,000 rotations-per-minute. The
J-2X engine -- built by Pratt & Whitney Rocketdyne of Canoga Park,
Calif. -- will power the upper stage of NASA's Space Launch System,
managed at the Marshall Space Flight Center in Huntsville, Ala. The new
heavy-lift rocket system will launch the Orion spacecraft and enable
humans to explore new destinations beyond low Earth orbit.
Image credit: NASA/SSC
NASA
Guillermo Gonzalo Sánchez Achutegui
ayabaca@gmail.com
ayabaca@hotmail.com
ayabaca@yahoo.com
No hay comentarios:
Publicar un comentario
Por favor deja tus opiniones, comentarios y/o sugerencias para que nosotros podamos mejorar cada día. Gracias !!!.